F07A/0697
GRANT PERMISSION FOR RETENTION
31-Jul-2007
If a decision has been made, then listed below are the conditions and reasons attached with the decision of Fingal County Council. The category of decision made, determines what is displayed under the type column:
- Conditions are associated with grants
- Reasons are given for refusals
- Directives are items requested under Additional Information
- Informatives are items requested under clarification of Additional Information
- Notes are reasons for invalidating a planning application
In some cases, a combination of conditions, reasons, directives and informatives are used with regard to split decisions i.e. grant permission and refuse permission.
N.B. In the event of an appeal, any decision by An Bord Pleanala will supercede the above, the details of which (from 2002 onwards) can be found by following the path to the website under the Appeal tab.
| Type |
Description |
| Condition
|
The development to be retained in its entirety in accordance with the plans, particulars, specifications, and information lodged with the application, save as may be required by the other conditions attached hereto.
REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained.
|
| Condition
|
This permission is for a period of three years only from the date of Final Grant of Permission. On expiration of this period, the site shall be reinstated to its pre-development state. This includes the removal of all built structures and related utilities to the satisfaction of Fingal County Council. This reinstatement shall be completed within three months of expiration of the permission.
REASON: To enable the Planning Authority to review and reassess the operation of the development in light of circumstances then pertaining.
|
| Condition
|
That the following requirements of the Water Services Department, Fingal County Council shall be strictly complied with and adhered to:
Foul Sewer
i. No foul drainage is to discharge into the surface water system under any circumstances.
ii. The foul drainage must be in compliance with the 'Regional Code of Practice for Drainage Works Version 6.0' FCC April 2006.
iii. Applicant to submit acceptable foul sewer details.
Surface Water
i. No surface water/ rainwater is to discharge into the foul sewer system under any circumstances.
ii. The surface water drainage must be in compliance with the 'Regional Code of Practice for Drainage Works Version 6.0' FCC April 2006.
iii. Soakways must comply with BRE Digest 365 and be at least 5m from the proposed structure.
iv. Applicant to submit acceptable foul sewer details.
Water Supply
i. The following works shall be carried out by Fingal County Council Water Division at the applicant’s prior expense:
(a)The connection to the public watermain.
(b)The testing, cleansing and sterilisation of all new mains
(c)The provision of tappings to serve individual properties.
ii. All water fittings and installations must incorporate best current practices in water conservation.
iii. The water supply for the development must comply with the 'Guidelines for the Laying of Distribution Watermains' Water Services Department, FCC, Dec 2004.
REASON: In the interests of public health and in order to ensure adequate drainage provision.
|
| Condition
|
All public services to the proposed development, including electrical, telephone cables and equipment shall be located underground throughout the entire site.
REASON: In the interest of amenity.
|