F07A/0800
GRANT PERMISSION
14-Aug-2007
If a decision has been made, then listed below are the conditions and reasons attached with the decision of Fingal County Council. The category of decision made, determines what is displayed under the type column:
- Conditions are associated with grants
- Reasons are given for refusals
- Directives are items requested under Additional Information
- Informatives are items requested under clarification of Additional Information
- Notes are reasons for invalidating a planning application
In some cases, a combination of conditions, reasons, directives and informatives are used with regard to split decisions i.e. grant permission and refuse permission.
N.B. In the event of an appeal, any decision by An Bord Pleanala will supercede the above, the details of which (from 2002 onwards) can be found by following the path to the website under the Appeal tab.
| Type |
Description |
| Condition
|
The development shall be carried out in its entirety in accordance with the plans, particulars, and specifications lodged with the application, save as may be required by the other conditions attached hereto.
REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained.
|
| Condition
|
The applicant shall ascertain and strictly adhere to the requirements of the Transportation Department, Fingal County Council.
REASON: In the interest of traffic safety.
|
| Condition
|
Permission for this development shall expire on 18/08/2012, and the structures shall be removed and the site reinstated at the expiry of that period unless before that date permission for their retention is granted by the Planning Authority or by an Bord Pleanala on appeal.
REASON: To enable the Planning Authority to review and re-assess the operation of the development in light of circumstances then pertaining.
|
| Condition
|
The following requirements of the Water Services Department shall be complied with in this development:
FOUL SEWER
(i) No foul drainage is to discharge into the surface water system under any circumstances.
(ii) The foul drainage must be in compliance with the 'Regional Code of Practice for Drainage Works Version 6.8' FCC April 2006.
SURFACE WATER
(i) No surface water/rainwater is to discharge into the foul sewer system under any circumstances.
(ii) The surface water drainage must be in compliance with the 'Regional Code of Practice for Drainage Works Version 6.0' FCC April 2006.
(iii) Soakways must comply with BRE Digest 365 and be at least 5m from the proposed dwelling.
WATER SUPPLY
(i) To assist in monitoring the level of service, at each stopcock the applicant is to provide a boundary box to a design approved by the Water Division, Fingal County Council.
(ii) The following works shall be carried out by Fingal County Council Water Division at the applicant’s prior expense:
(a)The connection to the public watermain.
(b)The testing, cleansing and sterilisation of all new mains.
(c)The provision of tappings to serve individual properties.
(iii) To ensure a continuation of water supply, the applicant is to provide for 24 hour water storage.
(iv) All water fittings and installations must incorporate best current practices in water conservation.
(v) The water supply for the development must comply with the 'Guidelines for the Laying of Distribution Watermains' Water Services Department, Dec 2004.
REASON: In the interest of the proper planning and development of the area.
|
| Condition
|
All necessary measures shall be taken by the contractor including the provision of wheel wash facilities to prevent the spillage or deposit of clay, rubble or other debris on adjoining roads during the course of the works.
REASON: To protect the amenities of the area
|
| Condition
|
All public services to the proposed development, including electrical, telephone cables and equipment shall be located underground throughout the entire site.
REASON: In the interest of amenity.
|